Log In | Contact Us| View Cart (0)
Browse: Collections Digital Content Subjects Creators Record Groups

Hardy Evans Collection

Overview

Scope and Contents

Detailed Description

Box 1



Contact us about this collection

Hardy Evans Collection, 1920-1924 | UNA Archives and Special Collections

By Dixie Norwood

Printer-friendly Printer-friendly | Email Us Contact Us About This Collection

Collection Overview

Title: Hardy Evans Collection, 1920-1924Add to your cart.

Primary Creator: Hardy Evans Collection, 1920-1924

Extent: 1.0 Boxes

Scope and Contents of the Materials

This collection contains photographs of the construction of Wilson Dam between the years of 1920 and 1924.

Box and Folder Listing


Browse by Box:

[Box 1],
[All]

Box 1Add to your cart.
Item 1: Scenes of a small village (No Date)Add to your cart.
Item 2: Barges on the river (No Date)Add to your cart.
Item 3: View of flooded river basin (No Date) (x2)Add to your cart.
Item 4: Construction workers studying their next move (July 23, 1920)Add to your cart.
Item 5: North abutment-General view of north abutment, showing blocks 1, 2, and 4 completed to 506 (April 1, 1923)Add to your cart.
Item 6: Ongoing construction of Wilson Dam (No Date)Add to your cart.
Item 7: Men working on a portion of Wilson Dam (No Date)Add to your cart.
Item 8: Construction continues (No Date)Add to your cart.
Item 9: Very early stages of construction (May 26, 1920)Add to your cart.
Item 10: General view of project from bluff, upper lock approach, north bank showing river in flood {Florence gage 20.6} (March 16, 1922)Add to your cart.
Item 11: Upstream face of dam looking north from Jackson Island (November 18, 1923)Add to your cart.
Item 12: Spillway section-General view of dam upstream side (August 4, 1924)Add to your cart.
Item 13: Aerial view of early construction site (No Date)Add to your cart.
Item 14: View of construction site from one side of river (October 31, 1920)Add to your cart.
Item 15: Men working on a building (No Date)Add to your cart.
Item 16: Wooden ramps (No Date)Add to your cart.
Item 17: Extended view of inside of a possible hull (No Date)Add to your cart.
Item 18: Man inside a concrete opening (No Date)Add to your cart.
Item 19: Rebar and wood (No Date)Add to your cart.
Item 20: Wood yard (No Date)Add to your cart.
Item 21: Concrete view (No Date)Add to your cart.
Item 22: A view from inside (No Date)Add to your cart.
Item 23: A view from inside a possible turbine (No Date)Add to your cart.
Item 24: A close-up view (January 27, 1924)Add to your cart.
Item 25: Man staging a photo in piece of dam (No Date)Add to your cart.
Item 26: Possible turbine engine for dam (No Date)Add to your cart.
Item 27: Possible turbine engine for dam (No Date)Add to your cart.
Item 28: Construction workers doing their part (No Date)Add to your cart.
Item 29: Continued work on spillway (No Date)Add to your cart.
Item 30: Early stages of construction (No Date)Add to your cart.
Item 31: Started pouring at 9:55 (March 27, 1923)Add to your cart.
Item 32: Power House section-view looking down on units showing intake forms in place (April 1, 1923)Add to your cart.
Item 33: Lock Section-south side of guide wall for upper lock (August 18, 1924)Add to your cart.
Item 34: Lock Section-view of forms being placed in upper lock, river side wall (April 1, 1923)Add to your cart.
Item 35: Looking south (No Date)Add to your cart.
Item 36: Very early photo of beginnings of dam progress (August 19, 1920)Add to your cart.
Item 37: View of eventual Power House Site (No Date)Add to your cart.
Item 38: Aerial view of continued work and progress of dam (No Date)Add to your cart.
Item 39: View of distant railroad bridge (No Date)Add to your cart.
Item 40: View of men working with railroad bridge in distance (No Date)Add to your cart.
Item 41: An accident has occurred (May 25, 1920)Add to your cart.
Item 42: A man stands inside the potential Power House section of the dam (No Date)Add to your cart.
Item 43: Houses, housing, work buildings (No Date)Add to your cart.
Item 44: Studying the best way to get the job done (No Date)Add to your cart.
Item 45: Continued work on spillway (No Date)Add to your cart.
Item 46: A view from the Power House railroad (No Date)Add to your cart.
Item 47: South Side-general view of Power House railroad around bluff at south side (March 1, 1923)Add to your cart.
Item 48: Aerial view of construction of Power House (No Date)Add to your cart.
Item 49: A view of a muddy situation (No Date)Add to your cart.
Item 50: View showing chutes leading from track hoppers, concrete car in place (November 23, 1922)Add to your cart.
Item 51: Spillway section-general view upstream side (August 4, 1924)Add to your cart.
Item 52: Up-close view of work on spillway (No Date)Add to your cart.
Item 53: View of Power House section with spillway construction in the distance (No Date)Add to your cart.
Item 54: Men on concrete car on tracks (No Date)Add to your cart.
Item 55: Men posing around Marion for photograph where they are clearing dirt for new construction (No Date)Add to your cart.
Item 56: Riprap for protection of south side of Patton Island (May 5, 1924)Add to your cart.
Item 57: Moving a wooden portion of spillway (No Date)Add to your cart.
Item 58: Photograph of old mill that was flooded with creation of Wilson Dam (No Date)Add to your cart.
Item 59: A river view of construction (No Date)Add to your cart.
Item 60: Looking south at continued construction (No Date)Add to your cart.
Item 61: A look at the railroad construction (April 2, 1920)Add to your cart.
Item 62: Man standing on turbine wheel (No Date)Add to your cart.
Item 63: General view of Cofferdam #2 from downstream side of dam (July 31, 1922)Add to your cart.
Item 64: View from Rocks at flooded area of construction (April 2, 1920)Add to your cart.
Item 65: View of early construction of spillway (No Date)Add to your cart.
Item 66: Aerial view of continued progress of Power House (No Date)Add to your cart.

Browse by Box:

[Box 1],
[All]


Page Generated in: 0.054 seconds (using 195 queries).
Using 2.57MB of memory. (Peak of 2.85MB.)

Powered by Archon Version 3.21 rev-3
Copyright ©2017 The University of Illinois at Urbana-Champaign